CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY
The Nigerian Railway Corporation (NRC) has been in existence for years. It is regarded the largest transport corporation in Nigeria and has a high network operations. The Nigerian railway corporation is One Hundred and Fourteen years (114) old and it runs a unilaterally designed track system of 1067mm charge gauge. Only 30km of its track distribution is in double track and that is within Lagos area. Nigerian Railway Corporation actually commenced rail business activities with the construction of the first rail line from Lagos to Ibadan 193m between 1998 and 1901. By 1964 when the construction of 640km Kano-Maiduguri rail line, then known as Bornu extension, was completed, the present core of the railway network hard been put in place.
NOT THE TOPIC YOU ARE LOOKING FOR?
Once payment is made, kindly send us your project topic, email address and payment name to +234 810 144 4147
Once payment is confirmed, Project materials will be sent to your email