hello@iresearchng.com Opening: Mondays - Sundays: 24hrs

DESIGN AND IMPLEMENTATION OF COMPUTER BASED SCHEDULING SYSTEM FOR A TRANSPORT COMPANY

Computer Science
Project Research
Pages: 52
Available
Available
1-5 Chapters
Abstract Available
Available
Instant Download
NGN 5,000

Project Research Pages: 52 Available Available 1-5 Chapters Abstract Available Available Instant Download NGN 5,000

Get this Material Now
Project Research Pages: 52 Available Available 1-5 Chapters NGN 5,000 Abstract Available Available Instant Download
DESIGN AND IMPLEMENTATION OF COMPUTER BASED SCHEDULING SYSTEM FOR A TRANSPORT COMPANY

CHAPTER ONE

INTRODUCTION

STATEMENT OF PROBLEM

A scheduling situation in a transport company develops when buses are expected to dispatch effectively.

Scheduling needs the dispatch and general information about routes to generate optimal transportation resources schedules. Lack of management and scheduling modules have cause a big problem for most transport companies. As a result of these problems, these transport companies have not been able to present charts and text reports for these companies.

These transport companies can not export solutions as text files in MS Word or MS Excel.

Lack of scheduling algorithms have led to lack of generating of the different resources schedules.

Lack of near-optimal resources schedules generation have prevented benchmarking an existing solution. Existing routes along with resources assignments can not be imported into the system “as is’ and calculate to reproduce the benchmark solution. The solution can not be generated and compared to the benchmark solution. The two solutions cannot be compared in the form of reports and Grantt Charts to identify opportunities for better resources utilizations.

Route data can not be imported in the form of ASCLL files.

There is no data import wizard that will guide user’s through a set up process for importing route data into the system. Lack of data view to enable user’s to sort the routes based on different criteria (route ID) Departure Time etc).

PURPOSE OF THE STUDY

This research work is meat to find out whether the above mentioned problems can effectively be eradicated by employing computer system to control the scheduling system of a transport company. In other words, to find solution to these problems mentioned above using a computer system.

AIMS AND OBJECTIVES

The aim and objective of this research work is to come up with a more suitable scheduling system in a transport company. (A computer based scheduling system) that can eliminate completely the above mentioned problems using a computer system. For instance, to come up with a scheduling system that can generate optimal buses and driver schedules for a given dispatching scenario.

Perhaps, the new system will not just eradicate the problems which will automatically improve the schedules.

SCOPE OF THE STUDY

This project work covers every area of scheduling activities where a scheduling tool generates optimal buses and drives schedules for a given dispatching scenario.

For instance, this tool provides an estimate of required number of buses and drivers for a particular dispatching scenario. It also generates resource scheduling that can result in significant cost reduction by using the optimal number of resources required.

DESIGN AND IMPLEMENTATION OF COMPUTER BASED SCHEDULING SYSTEM FOR A TRANSPORT COMPANY

NOT THE TOPIC YOU ARE LOOKING FOR?


SUGGEST A TOPIC

OR

Try searching for your topic

Confuse about anything?

Call or WhatsApp us

+234 810 144 4147

Or reach us via email

hello@iresearchng.com

How do I get the Complete Project material on DESIGN AND IMPLEMENTATION OF COMPUTER BASED SCHEDULING SYSTEM FOR A TRANSPORT COMPANY

Once payment is made, kindly send us your project topic, email address and payment name to +234 810 144 4147

Once payment is confirmed, Project materials will be sent to your email

What's your project topic?

Related Project Topics

Projects By Departments

Explore Thousands of Research Project Topics.

Get project material instantly!